| Valor | Categoría | Casos | |
|---|---|---|---|
| DAÑOS TUBERIA | 1 |
5.9%
|
|
| DIFERENCIA PRODUCIDA | 1 |
5.9%
|
|
| ERRORES TOTALES DE ESTIMACION | 1 |
5.9%
|
|
| ESTIMADO | 2 |
11.8%
|
|
| MANTENIMIENTO DE PLANTAS | 1 |
5.9%
|
|
| NO DETERMINADAS | 1 |
5.9%
|
|
| NO ESPECIFICA | 2 |
11.8%
|
|
| NO ESTABLECIDAS | 1 |
5.9%
|
|
| NO IDENTIFICADAS | 1 |
5.9%
|
|
| POR REBOSE DEL CANAL Y POR RECORRIDO | 1 |
5.9%
|
|
| TOTALES | 3 |
17.6%
|
|
| TUBERIAS DIRECTAS | 1 |
5.9%
|
|
| USO CAMAL MUNICIPAL | 1 |
5.9%
|